York Region, ON

Permeable Driveway in Aurora

Permeable Resin Bound Colour

Frosted Earth

Driveway Area 'De-Paved'

680 Sq. Ft.

Stormwater Run-off Absorbed

122,000 Litres Annually

Installation Date

September, 2024

Edging Stone

Natural Flag Stone